Phased Manufacturing Programme

Implementation status of PMP for cellular mobile handsets and sub-assemblies / parts / sub-parts thereof:
Year Sub-Assembly

2016-17

(i) Charger/ Adapter - (Implemented: 20% BCD w.e.f. Budget 2020-21),

(ii) Battery Pack, (iii) Wired Headset - (Implemented: 15% BCD)

2017-18

(iv) Mechanics, (v) Die Cut Parts,- (Implemented: 10% BCD w.e.f. 30.01.2024)
(vi) Microphone and Receiver, (vii) Key Pad, (viii) USB Cable - (Implemented: 15% BCD)

2018-19

(ix) Printed Circuit Board Assembly (PCBA) - (Implemented: BCD increased to 20% w.e.f. 01.04.2020)

(x) Camera Module, (xi) Connectors - (Implemented: 10% BCD)

2019-20

(xii) Display Assembly, (xiii) Touch Panel/ Cover Glass Assembly

- (Implemented: 10% BCD w.e.f. 01.10.2020), (xiv) Vibrator Motor / Ringer - (Implemented: 10% BCD w.e.f. 01.04.2020)